Your ADU Journey

From Contract Signing to Move-In — California Homeowner Guide
6–18 months
Typical Timeline

Congratulations — you've taken the first step. This guide walks you through every milestone from the day you sign your contract to the day you hand your first tenant the keys (or move in yourself). California permits take 3–9 months — factory build begins once approved. We handle the complexity so you don't have to.

9
Steps
1
Point of
Contact
0
Surprises
Your Step-by-Step Journey
01 Week 1
Contract Signed & Kickoff
Your nanohouz project officially begins, and your $500 good-faith deposit from the proposal stage is credited toward your contract amount. You'll receive a welcome packet, your dedicated project manager's direct contact, and a project portal login. A kickoff call is scheduled within 48 hours.
Project manager assigned
02 Weeks 1–2
Site Assessment
Our team visits your property to verify setbacks, lot dimensions, utility access points, and site conditions. Any access or grading requirements are identified early so there are no surprises later.
On-site visit included
03 Months 1–9
Design Finalization & Permit Approval
Your floor plan is finalized and a complete permit package is prepared and submitted to your city or county. We handle all engineering stamps, Title 24 energy reports, and HOA submittals. Permit processing in California typically takes 3–9 months depending on your jurisdiction — this is the longest and most variable phase.
We handle all paperwork 3–9 month permit window
04 ~12–16 weeks after permit approval
Factory Build
Once permits are approved, your ADU enters production at our HUD-certified manufacturing facility. The build takes 12–16 weeks — running concurrently with on-site foundation and utility work so both are ready at the same time.
Concurrent with site prep Climate-controlled build
05 After permit approval
Site Preparation
Foundation is poured and utility rough-ins are completed (water, sewer, electrical) while your ADU is being built in the factory. Both phases finish around the same time — so your site is ready the moment your unit arrives.
Runs concurrent with factory build
06 ~2–4 weeks after site prep
Delivery & Set Day
Your completed ADU is transported from our facility and precision-set on your prepared foundation. Every set is completed in a single day — you wake up without an ADU and go to bed with one.
Always completed in one day
07 ~4–6 weeks after delivery
Utility Connections & Final Finishes
Water, sewer, electrical, and gas are connected and tested. Exterior finishing, landscape restoration, and any remaining interior touches are completed. Your project coordinator confirms everything is punch-list complete.
08 ~2–4 weeks after connections
Final Inspections & Certificate of Occupancy
The city or county performs its final inspection. We coordinate all inspector access and address any comments. Once approved, your Certificate of Occupancy is issued — the official green light.
C of O issued
09 Month 6–18 (permit dependent)
Move-In Ready — Keys in Hand
Your ADU is complete, permitted, and ready for occupancy. Whether you're moving in a family member, renting to a tenant, or adding to your investment portfolio — your nanohouz is ready.
Ready to occupy or rent