Offsite & Onsite Construction

Build an ADU
with nanohouz

Turn your property into a high-performing investment. Turnkey ADU planning, permitting, and installation for homeowners and multifamily operators across California.

scroll

nanohouz at a glance

Starting price
From $255,900Home and turnkey install
Sizes
378–2,200+ sq ft1–4 bedrooms, 112 floor plans
Timeline
6–18 monthsFirst call to move-in
Factory build
12–16 weeksAfter permits, set in one day
Where we build
CaliforniaHomeowners, investors and developers
First step
Free visitSee the homes in person
  1. Talk to our team. We call you back.
  2. Visit the homes. Free, in person.
  3. Get your proposal. The full cost for your lot.
  4. We permit, build and install. You move in.

Permit and impact fees are not included. Your proposal gives the full cost for your lot. Learn how it works

What We Build

Three paths to your vision

Choose the one that fits your project.

Experience building in

  • Campbell
  • Concord
  • Contra Costa County
  • Cupertino
  • Danville
  • Fremont
  • Hayward
  • Hillsborough
  • Los Gatos
  • Milpitas
  • Morgan Hill
  • Mountain View
  • Palo Alto
  • Petaluma
  • Portola Valley
  • Redwood City
  • San Francisco
  • San Jose
  • San Mateo
  • Santa Clara
  • Santa Cruz
  • Santa Cruz County
  • Scotts Valley
  • Sebastopol
  • Sunnyvale
  • Union City
  • Watsonville
Our ADUs

Best-selling Floor Plans

The floor plans our clients choose most, with starting prices. Browse every floor plan to filter by size, bedrooms, and baths.

Floor plans, renderings and photographs are for reference only. Dimensions and square footage are approximate, and homes vary with the options selected and site conditions.

Our Process

Your partner for planned developments

Our process is optimized to deliver quality in a timely manner. Outsource it all to us or choose just the services you need.

01

Design Process

Contact us, and we call you to talk through your property and goals, then schedule a free visit to see the homes and options in person. After the visit, a $500 good-faith deposit pays for our property visit and a detailed proposal; it is credited toward your contract and refunded if you choose not to move forward after the proposal. Design sessions for finishes and details come after the contract.

02

Acquiring Permits

We have extensive knowledge of local permitting requirements and established working relationships with city agencies. Permits typically take 3–9 months, depending on your city.

03

Manufacturing

Your new unit is built within our controlled environment, preventing on-site delays and eliminating construction-related disruptions. The factory build takes 12–16 weeks after permit approval, alongside site prep.

04

Delivery & Install

Your nanohouz is delivered from the factory and set on its foundation in a single day. Utility connections and final finishes take about 4–6 weeks, then final inspections.

05

Occupancy

Once installation is complete and all inspections passed, we prepare the home to be move-in ready for you or your tenants.


Faster, smarter housing development

Offsite Construction

Benefit from shorter on-site construction timelines, robust quality control, and reduced project delays.

The Services You Need

Let our in-house teams of design, permitting and project management handle it all or choose only the services you need.

Unmatched Supply Chain

By working with several leading home manufacturers, we match your project with the best possible pricing and terms.

More Certainty, Less Risk

Our transparent, reliable pricing and value-add project management helps drive your project to success — on time and on budget.

About

Homebuilding, redesigned

nanohouz began as a team driven by a desire to do better. We recognized the growing need for housing and chose to apply our skills, experience, and passion for construction and design to deliver an exceptional product.

Built on Trust & Responsibility

Trust is the foundation of every nanohouz project. We operate with honesty, clear expectations, and accountability at every stage from feasibility review to final delivery.

Designed for Real Life

Every nanohouz is built to serve a purpose. Whether creating additional living space or adding long-term property value, our focus is on functionality, durability, and thoughtful design.

Discipline in Execution

Successful construction requires preparation, coordination, and focus. We follow a structured process that prioritizes clarity, efficiency, and consistent execution from start to finish.

Why nanohouz

Smarter housing development

Unmatched Variety

Over 100 floor plans ranging from 400 to 2,200+ sq ft, with studio to 3-bedroom configurations. We offer manufactured homes for cost-effective speed, or fully custom onsite builds — whatever fits your needs.

Customized to You

Select your preferred model and customize design features, finishes, and layout to match your property and personal style.

Quick Construction

Offsite manufacturing reduces timelines significantly. Your unit is built in a controlled environment, minimizing delays and on-site disruption.

Move-in Ready

From permits through installation and finishing, we handle everything. Your ADU arrives complete with appliances, fixtures, and utility connections.

Pricing

What's included in our turnkey process

Permits & Plans

All site, floor, foundation, utility, and structural plans. Permit research, facilitation, and processing of local and state permit fees once the city issues them (the fees themselves are not included in our price).

Site Prep & Foundation

Clearing, excavating, stem wall foundation footings and piers, utility trenching, and slope adjustments.

Construction

Load-bearing steel frame, asphalt shingles, tempered low-emittance windows, installed flooring, heating, ventilation, and A/C ready.

Appliances

Refrigerator/freezer, oven & range, microwave/range hood, dishwasher, and washer/dryer hookups included.

Utility Hookups

Electrical, sewer, and water hookups with up to 50 feet of trenching.

Installation & Finishing

Delivery to the project site, all interior and exterior finishing including siding, entryway stairs & landing, stitching and seaming.

Every home is planned around its site and its owner, so your signed contract is the final agreement on scope, inclusions and price. Where it differs from anything shown on this website, the contract governs.

The Pricing Process

Full control from beginning to end

Free Estimate

It starts with a free initial estimate based on our experience building hundreds of homes, including assumptions on materials and site work.

Feasibility Study

A detailed review of your site-specific requirements. It's an easy first step that gives you all the information you need to move forward confidently.

Project Services Agreement

This includes a fine-tuned budget range based on your Feasibility Study, plus your chosen upgrades. Once signed, we start on permits.

Authorization to Build

You'll be presented with a final total project cost. This pricing takes into account any new information uncovered during permitting.

Build Begins

Your dedicated project manager will keep you well-informed of the payment milestones for the duration of your project.

What could make your price go up?

Your Feasibility Study will uncover any additional costs based on your unique lot and preferences.

Pool filling

Tree removal

Fire sprinklers

Septic

Ground well

Structure demolition

Site grading

Bedrock or clay soil

Electric panel upgrades (as the project needs)

Design upgrades

Financing

The power of nanohouz planning

Our ADUs offer strong long-term value. With financing partners, we explore options that significantly offset project costs.

Home Equity Line of Credit (HELOC)

Leverage your existing home equity to fund your ADU project with flexible draw periods.

Refinance Your Existing Mortgage

Unlock better rates and roll your ADU costs into a refined mortgage structure.

New Loan

Secure a dedicated construction or personal loan tailored to your ADU investment.

Get in Touch

Let's build your vision

Whether you're looking to add rental income, create space for family, or build a backyard office, our team is here to support your construction goals. Contact us and we will call you to schedule your visit.

Currently serving California
HCD Dealer License DL1639848
Add your address and how you found us (optional)
FAQ

Frequently asked

Yes. Contact us through our contact form or at info@nanohouz.com, and we will call you to schedule your visit.

The visit is free. After your visit, a $500 good-faith deposit, paid by card or Zelle, pays for our visit to your property and a detailed proposal. It is credited toward your contract when you move forward, and fully refunded if you choose not to move forward after you receive your proposal. Design sessions for finishes and details come after the contract.

nanohouz builds both manufactured (prefab) ADUs and custom onsite ADUs. Our manufactured ADUs are HUD-certified, built at our factory partners under controlled conditions, and set on a permanent foundation at your property — offering faster timelines and predictable costs. Custom onsite builds are available for homeowners who need a unique design or have a lot that requires a site-built approach. Both options are detached, fully permitted, and delivered move-in ready.

Yes. In addition to ADUs, nanohouz also offers primary home construction, bringing the same quality, efficiency, and transparent process to full-scale residential builds.

Our turnkey process is designed to handle everything from permits through move-in readiness. Contact us to discuss your specific needs and what level of involvement works best for your project.

Yes. Permit acquisition is a core part of our service: we handle the permit research, prepare and submit the permit package, and work with your city until it is approved. Permit fees are not included in our prices; they are paid to the city and other agencies and vary by project.

Most projects take 6–18 months for the full process, from your first call to move-in. Permitting is the longest phase: 3–9 months, depending on your city. Once permits are approved, the factory build takes 12–16 weeks and runs alongside site prep. The home is set on its foundation in a single day; utility connections and final finishes take about 4–6 weeks, and final inspections about 2–4 weeks.

All plans and permits; site prep and foundation; construction with a load-bearing steel frame, asphalt shingles, tempered low-emittance windows, installed flooring, and heating, ventilation and A/C ready; appliances (refrigerator/freezer, oven and range, microwave/range hood, dishwasher, and washer/dryer hookups); electrical, sewer and water hookups with up to 50 feet of trenching; and delivery, installation and all interior and exterior finishing.

Your Feasibility Study identifies any additional costs for your lot before you commit. Common ones include pool filling, tree removal, fire sprinklers, septic, a ground well, structure demolition, site grading, bedrock or clay soil, electric panel upgrades, and design upgrades. Our 2026 ADU cost guide (PDF) walks through each one.

Four series, named by shape: Nano Haven (single-section), Nano Nook (L-shaped), Nano Nexus (two-story) and Nano Nova (two-section), from 378 to 2,200+ sq ft. With custom onsite builds, homes range from 1 to 4 bedrooms.

nanohouz builds across California, for homeowners, investors and developers.

Latest Guides

California housing law, explained