nanohouz partners with investors, developers, and multi-property owners to deploy manufactured housing at scale — duplexes, triplexes, fourplexes, and entire manufactured communities.
Whether you own one lot or twenty properties, nanohouz has a path to maximize what your land produces.
Develop a parcel into a planned community of manufactured homes. We handle site planning, infrastructure, permitting, and delivery for projects of any scale — from 5 units to 50+.
Maximize density on your lot with multi-unit manufactured builds. Our team knows how to stack units efficiently, navigate zoning, and deliver a finished product that attracts quality tenants.
Already own multiple properties? We audit your portfolio and identify where adding units — ADUs, accessory structures, or replacements — will generate the greatest return on your existing land.
Speed, predictability, and cost efficiency — the three things investors need most. Manufactured construction delivers all three.
The factory build runs alongside site work, so units are ready to set as soon as the foundation is. Less time under construction means less holding cost and faster cash flow.
Offsite construction reduces material waste and labor costs significantly. At scale, the savings compound across every unit in your project.
Manufactured construction dramatically reduces the variables that blow budgets — weather, labor shortages, material delays. You know your number before you break ground.
Our supply chain and manufacturing partnerships allow us to deploy multiple units simultaneously across multiple sites — with consistent quality at every location.
We assess your land, zoning, and goals to identify the highest-value development strategy for your specific situation.
Site plan, unit count, infrastructure requirements, and a transparent project budget — before you commit to anything.
We manage all permitting, utility coordination, and agency approvals. Multi-unit projects require more — we've done it before.
Units are built in parallel at the factory and delivered on a coordinated schedule. Multiple units, one streamlined process.
Every unit is inspected, finished, and ready for tenants. We don't hand over a project — we hand over a performing asset.

A California ADU takes 6–18 months from first call to move-in, and permits drive most of that spread. Here is each phase in order, the state deadlines inside the permit phase, where projects lose time, and what an owner can speed up.

A HUD-code manufactured home counts as an ADU under California law. Here is who approves what, how the home is set on a permanent foundation, what the inspector checks, and how form 433A makes it part of your real property.

Every nanohouz floor plan now shows a starting price. Here's what it covers, what our turnkey scope includes, and the lot-specific fees, site work and utility costs that move a California ADU's final number.
Whether you have one lot or a dozen properties, our development team will put together a strategy tailored to your investment goals.
Get a Free Estimate