A Starting Price Is a Floor, Not a Quote

Every floor plan on nanohouz.com now shows a starting price: "From" and a number. It answers the first question most homeowners have, which is whether a plan is in range at all. It does not answer the second one: what that ADU will cost on your lot.

Read the starting price as the plan in its standard configuration and finishes, built through our turnkey process on a straightforward site. Two identical homes can finish at different totals on two lots in the same city, because the costs that move are the ones the factory never sees: your city's fees, your soil, your slope, your utility service, and the route a delivery truck takes into your backyard.

That is why the starting price comes before our pricing process, not at the end of it. A free estimate applies standard assumptions to your property. A feasibility study reviews your site's specific requirements. The Project Services Agreement sets a fine-tuned budget range with your chosen upgrades, and the Authorization to Build gives you a final total project cost after permitting, once the last unknowns are resolved.

What the Turnkey Scope Covers

A low number that leaves out the foundation or the sewer line is not a low number. Compare any ADU price, ours included, against the full scope of work. Our turnkey process includes:

  • Permits and plans: Site, floor, foundation, utility, and structural plans, plus permit research, facilitation, and processing. Permit fees are not included: your city and the other agencies charge them separately, as the fee section below explains.
  • Site prep and foundation: Clearing, excavating, stem wall foundation footings and piers, utility trenching, and slope adjustments.
  • Construction: Load-bearing steel frame, asphalt shingles, tempered low-emittance windows, installed flooring, and heating, ventilation, and A/C ready.
  • Appliances: Refrigerator/freezer, oven and range, microwave/range hood, dishwasher, and washer/dryer hookups.
  • Utility hookups: Electrical, sewer, and water hookups with up to 50 feet of trenching. An electric panel upgrade, when your project needs one, is extra.
  • Installation and finishing: Delivery to the project site and all interior and exterior finishing, including siding, entryway stairs and landing, and stitching and seaming.

The rest of this article covers what can sit outside a standard site. Your feasibility study identifies which of these apply to your lot before you commit.

Government Fees: Set by Your City, Not by the Plan

Fees vary more from one address to the next than any other line, because a city, a school district, and one or more water and sewer agencies each set their own. State law caps several of them, and most of the caps turn on square footage.

  • Impact fees: None on an ADU with 750 square feet of interior livable space or less. Above that, they are charged in proportion to the primary home. Our guide to the 750-square-foot line shows the math. From January 1, 2027, SB 1117 limits those fees to the area above 750 square feet for up to two ADUs on a lot.
  • School fees: Districts may charge them on ADUs over 500 square feet. The State Allocation Board set the 2026 maximum Level I rate at $5.38 per square foot, about $4,300 on an 800 sq ft ADU. Districts that qualify for Level II or Level III fees can charge more.
  • Water and sewer connection fees and capacity charges: These sit outside the impact-fee exemption, and they depend on whether your provider requires a separate connection. Hayward's current utilities checklist shows the spread. A new-construction ADU that needs its own water meter carries an estimated $19,701 in utility fees: $6,560 to install the service line, a $7,846 meter facilities fee, and a $5,295 sewer capacity fee. For a conversion of existing space, where only the existing meter has to be upsized, the estimate is $4,517.
  • Building permit and plan check fees: These pay for review and inspection, so the 750-square-foot exemption does not reach them. Sacramento's ADU fee estimate, revised July 2026, puts city fees for a new 749 sq ft ADU at about $5,270 and a 1,200 sq ft ADU at about $14,840. Both figures exclude school fees and county sewer fees.

Put together, agency fees on the same plan can range from a few thousand dollars to well into five figures depending on the city and the utility. Fees also set part of the calendar: California's 60-day permit shot clock limits how long a city can take to act on a complete application.

Site Conditions

Our standard scope covers clearing, excavation, the foundation, slope adjustments, and up to 50 feet of utility trenching. These conditions go beyond it:

  • Site grading and retaining walls: A level backyard needs little work. A sloped one can need significant grading or retaining walls, and walls can need their own engineering.
  • Bedrock or clay soil: Expansive clay, or rock close to the surface, changes how footings are designed and dug. Your building department may also ask for a soils report.
  • Extended utility trenching: Deep lots put the ADU far from the water meter, the sewer lateral, and the electric service. Every foot past 50 adds trenching, pipe, wire, and surface repair. An ADU that sits below the sewer connection may also need a pump.
  • Septic and wells: Without public sewer or water, a septic system or a ground well needs its own design and county environmental health approval.
  • Tree removal, demolition, and pool filling: Clearing the pad can mean removing a tree (many cities require a permit for protected trees), demolishing a garage or shed, or filling an old pool.

Electric Panel and Utility Service

If your electric panel cannot carry the ADU, it needs an upgrade, which is an added cost your feasibility study prices. The utility's side of the meter is a separate job again. When an ADU adds more load than your current service can carry, the utility may need to upgrade the service line or the transformer, and some cities require a separate electric meter for new ADU space. Hayward, for example, requires a separate PG&E meter for an ADU with new space and makes the owner responsible for its installation cost.

The utility sets that price and that schedule. PG&E says project costs vary with the type of service requested, the work it does at the site, and surrounding conditions, and it gives a firm estimate only after engineering. A 2024 SPUR report, citing PG&E figures for residential service upgrades, found customers paid $7,500 to $10,000 after the utility's allowance in 55 percent of cases, and upward of $30,000 in 5 percent. Apply early. Utility work runs on its own timeline, separate from the city permit.

Fire Sprinklers

Under Government Code section 66314(d)(12), an ADU cannot be required to have fire sprinklers if they are not required for the primary residence, and building an ADU cannot trigger sprinklers in the existing house. If your house already has sprinklers, plan on them in the ADU. On long flag lots and hillside parcels, raise fire-department access early, because it can shape the site plan.

Delivery, Cranes, and Access

A manufactured ADU arrives in finished sections, so the route to the pad matters as much as the pad: driveway width and slope, side-yard clearance, gates, fences, overhead power lines, and tree canopy. Where the route allows, sections move into place on the ground. Where it does not, a crane lifts them over the house, which adds the crane, room for it to set up, and sometimes a city permit to occupy the street. Long driveways and steep approaches can also add handling time or temporary protection for paving. Access is one of the site-specific requirements your feasibility study reviews.

Design Upgrades

The starting price uses standard finishes. Finish and feature upgrades you choose are priced on top of it and written into the budget in your Project Services Agreement.

Solar: A Cost a HUD-Code ADU Avoids

According to the California Energy Commission, a newly constructed detached ADU must install new solar PV to meet the 2025 Energy Code's prescriptive requirements, unless an exception applies. HUD-code manufactured homes are treated differently. The same CEC guidance says manufactured homes with a HUD label must meet the Title 25 regulations and are not subject to the Energy Code, and HCD's Information Bulletin 2020-01 says they are exempt from the Energy Code solar mandate. You can still add solar by choice. Factory-built (modular) homes must comply with Title 24, including the Energy Code; our guide to manufactured vs. modular ADUs explains the difference.

How to Read the Number

  • Use it to shortlist: The starting price tells you which plans fit. It does not set your budget.
  • Compare scope, not totals: Ask any other ADU quote whether it includes the foundation, trenching, utility hookups, the panel upgrade, appliances, and permit processing.
  • Price both sides of 750 and 500: Near those lines, a slightly smaller plan can save more in fees than the difference in starting price suggests.
  • Call your utilities early: Ask whether the ADU needs its own water meter, sewer connection, or electric meter, and what each one costs.
  • Treat the feasibility study as the first real number: The final total comes at Authorization to Build, after permitting.